x
Gökhan Fidancı
TPM Danışmanı

Autonomous Maintenance First Stage Management Document Control Form

Summary
We use these forms to initiate autonomous maintenance activities in factories and to complete and follow-up the first phase. Development form, abnormality list, abnormality matrix, hard-to-do list, pollution sources list, temporary autonomous maintenance standard, permanent autonomous maintenance standard, cleaning standard, lubrication standard, and inspection standard.
Existing Standards
ISO 16949
Types
Ekipman yönetimi, Bakım yönetimi
Tags
tpm, kaizen, otonom bakım, bakım standardı, otonom bakım standardı, temizleme, yağlama, sıkılama, kontrol formları, anormallik listesi, anormallik matriksi
Attached Files
1. TPM Forms_JH Step1-3.xls